Originally Posted by excursion
No you do not need 0 degree ballast, but I would go electronic ballast more energy efficient. They use the smaller bulbs not the large bulds. The 5200 series are the ones that look BLUE.
Thnx Excursion yes we picked up 30 of the electronic ballast w/F96 bulbs /says 75 % brighter and we put up 2 so far and these 2 are brighter then with all 36 of the old bulbs .we're gonna need frickin sunglasses and tanning oil when we fire em all up
thnx again
RunninHotRacing163.1 is offline  
Old 12-08-2007, 06:05 PM
  #102  
Registered
 
excursion's Avatar
 
Join Date: Mar 2002
Location: Richmond Va
Posts: 2,276
Likes: 0
Received 1 Like on 1 Post
Default

30 !!!!! What are you lighting up , WALMART?????

You are going to really enjoy them. I only turn on the center row when need light, but when need DAYLIGHT flip all the rows on and you can see perfect.
excursion is offline  
Old 12-09-2007, 11:04 AM
  #103  
Off the Radar
Platinum Member
 
Linster's Avatar
 
Join Date: May 2001
Location: Short Pump or Colonial Beach, VA
Posts: 1,097
Likes: 0
Received 1 Like on 1 Post
Default

When you fire them up you want to let them burn in for about 45 minutes to increase lamp life.
Linster is offline  
Old 09-28-2010, 09:01 PM
  #104  
Registered
 
Expensive Date's Avatar
 
Join Date: May 2006
Location: West Creek NJ
Posts: 4,227
Received 1 Like on 1 Post
Default

Bryan,what do you think of thes kits?


http://diypolebarns.com/kits/
Expensive Date is offline  
Old 09-29-2010, 01:24 AM
  #105  
Forum Regulator
VIP Member
Thread Starter
 
Sydwayz's Avatar
 
Join Date: May 2001
Location: Worldwide
Posts: 23,891
Received 1,263 Likes on 551 Posts
Default

Originally Posted by Expensive Date
Bryan,what do you think of thes kits?


http://diypolebarns.com/kits/
Tim,
I did a quick quote of a building similar to what I built with Pioneer on that site. Including labor, it was less than 15% difference in pricing between the two. I have no idea on lumber quality of the DIY company. If you are getting close to pulling the trigger, give Pioneer a call. It's end of the month and end of the quarter. See what you can negotiate.

Last edited by Sydwayz; 09-29-2010 at 01:26 AM.
Sydwayz is offline  
Old 09-29-2010, 07:30 PM
  #106  
Registered
 
Expensive Date's Avatar
 
Join Date: May 2006
Location: West Creek NJ
Posts: 4,227
Received 1 Like on 1 Post
Default

Originally Posted by Sydwayz
Tim,
I did a quick quote of a building similar to what I built with Pioneer on that site. Including labor, it was less than 15% difference in pricing between the two. I have no idea on lumber quality of the DIY company. If you are getting close to pulling the trigger, give Pioneer a call. It's end of the month and end of the quarter. See what you can negotiate.
I will look at them not close just looking.I am not buying anything till my house is paid of and I am close.I need to take a bunch of trees down around the house the ones that were little when I built it are now getting big.So will move the tree line back for it behind the house when I do that.I go back 600 feet past the house so there is plenty of room.
Expensive Date is offline  
Old 09-29-2010, 07:46 PM
  #107  
Banned
 
Join Date: Sep 2007
Location: Frankfort,ill
Posts: 12,861
Likes: 0
Received 2 Likes on 2 Posts
Default

Originally Posted by excursion
30 !!!!! What are you lighting up , WALMART?????

You are going to really enjoy them. I only turn on the center row when need light, but when need DAYLIGHT flip all the rows on and you can see perfect.
30 !!!!! What are you lighting up , WALMART?????

thnx Excursion worked out awesome and would do it again the same
RunninHotRacing163.1 is offline  
Old 09-29-2010, 07:55 PM
  #108  
Registered
 
Expensive Date's Avatar
 
Join Date: May 2006
Location: West Creek NJ
Posts: 4,227
Received 1 Like on 1 Post
Default

If you don't mind me asking how much did your concrete cost.
Expensive Date is offline  
Old 09-29-2010, 08:45 PM
  #109  
Registered
 
Join Date: Sep 2003
Location: Here and There
Posts: 1,871
Received 14 Likes on 6 Posts
Default

Originally Posted by Sydwayz
Tim,
I did a quick quote of a building similar to what I built with Pioneer on that site. Including labor, it was less than 15% difference in pricing between the two. I have no idea on lumber quality of the DIY company. If you are getting close to pulling the trigger, give Pioneer a call. It's end of the month and end of the quarter. See what you can negotiate.
Bryan helped me with some questions when I built mine as well.

I also found that there was only about a 10% price difference between a DIY kit and having the barn company erect it. I am in Missouri and used a company call BCI out of Oklahoma.

As far as your land clearing is concerned I had to remove a forest for mine so I rented a highlift and pushed all the trees down. It worked really slick and I was able to clear the whole area in about 3 1/2 hours.

Good luck..
baywatch is offline  
Old 09-29-2010, 09:11 PM
  #110  
Forum Regulator
VIP Member
Thread Starter
 
Sydwayz's Avatar
 
Join Date: May 2001
Location: Worldwide
Posts: 23,891
Received 1,263 Likes on 551 Posts
Default

I have not poured the slab yet. I still have a gravel floor with thick plastic on top.


(This is actually a huge advantage of a post-frame construction building vs. girder steel frame or "aircraft hanger" type of steel building. Both require significant footings and high concrete costs UP FRONT.)

The portion of the property where my Toy Box is in a very wet area at certain times of the year. I had to build up the road with sand, and had to scoop out almost 2 full feet of natural soil where the barn pad would be, and fill it in with crushed rock, sand, under-road construction felt, and more sand. I have #57 crush and run that has been my "floor" for since I erected it. I wanted to make damn sure I was not going to have any settling before I went with concrete.

That said, I anticipate finally doing it this fall. I slowed my schedule due to this demolition derby impulse decision.

My concrete piers were poured by the barn company, which is what my posts rest on. They were then filled in with Sac-Crete. This was all including in the building/labor.

I anticipate 2200 sq ft of concrete including building floor and an apron to cost around $6K when all is said and done.
Sydwayz is offline  


Quick Reply: Active Thunder Toy Box is up!!!!


Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.