MitcherT project update........
#16
Registered
Join Date: Feb 2001
Location: Richmond VA
Posts: 376
Likes: 0
Received 0 Likes
on
0 Posts
Wow beautiful job. Reggie needs to hire Mitch to update the Fountain graphics on new boats. Thats one great looking boat you have I'll call ya when I vistit Chicago in the summer.
#17
Registered
Back4- how did the rubrail install go? did you use the original holes for the screws or did you fill them and make new ones, how about getting around the beek ? did you have to heat it??.........doug
#18
Registered
Thread Starter
Join Date: Feb 2002
Location: Lake Michigan
Posts: 6,627
Likes: 0
Received 0 Likes
on
0 Posts
No it needed new holes...they were of different centers, but some fell into the old ones.
This is actually the 3rd rub rail going on this boat.
1st one was the black, 2nd one the white, and the 3rd being the newer style with the insert.
I siliconed all the old ones and drilled new ones.
The beak and corners needed alot of heat to bend around them.
The insert was dunked in a can of 160* water which helped big time pushing it in with a 2" putty knife.
This is actually the 3rd rub rail going on this boat.
1st one was the black, 2nd one the white, and the 3rd being the newer style with the insert.
I siliconed all the old ones and drilled new ones.
The beak and corners needed alot of heat to bend around them.
The insert was dunked in a can of 160* water which helped big time pushing it in with a 2" putty knife.