84 Scarab Renovation (ongoing)
#251
Registered
Thread Starter
Join Date: Aug 2007
Location: Sandown, NH - Sebago Lake Region, ME
Posts: 2,960
Likes: 0
Received 7 Likes
on
7 Posts
One step closer to the real thing!
Got the test print taped on the boat today. The colors are not quite right because it is just printed on paper but you get the basic idea! Once I come back from havasu I hope to start printing the real thing!
Got the test print taped on the boat today. The colors are not quite right because it is just printed on paper but you get the basic idea! Once I come back from havasu I hope to start printing the real thing!
#257
Registered
Thread Starter
Join Date: Aug 2007
Location: Sandown, NH - Sebago Lake Region, ME
Posts: 2,960
Likes: 0
Received 7 Likes
on
7 Posts
Thanks guys!
That was the bow graphic I was printing, I plan to print the sides this upcoming week. It took 3 hours to print the bow which was about 13 feet long. The sides will probably take close to 8 hours for both to print!
I can't wait to put it on!!
That was the bow graphic I was printing, I plan to print the sides this upcoming week. It took 3 hours to print the bow which was about 13 feet long. The sides will probably take close to 8 hours for both to print!
I can't wait to put it on!!
#258
Registered
Thread Starter
Join Date: Aug 2007
Location: Sandown, NH - Sebago Lake Region, ME
Posts: 2,960
Likes: 0
Received 7 Likes
on
7 Posts
Finally installing some real K-Planes! I think I measured and re-measured a dozen times. Wanted to make sure the holes came through in the right place
Before.....
After.....
Before.....
After.....