The B.S. Thread
Registered
Platinum Member
All BS aside, anyone want to leave friday afternoon and drive over to Mobile and watch the OPA races and come back sunday??
I'll drive if someone will split the room with..
I'll drive if someone will split the room with..
Registered
Platinum Member
Scratch that. Looks like we should leave in the weeeee hours friday morning so we can be there for the friday race starting at noon, and leave sunday night after the races.
Bon Jovi concert one of the nights also.....
Bon Jovi concert one of the nights also.....
Registered
Magnum- nope
Scary Mary-nope
Flatdeck Scarab-Nope
what ever that other boat was -nope
what other boats did he part out and sell that I am missing..
what would make this one different????
I guess he still has time to get the Nortech ready for the Clear Lake Christmas parade....
Registered
Registered
Platinum Member
so you are asuming he would finish the Nortech...lets check the history
Magnum- nope
Scary Mary-nope
Flatdeck Scarab-Nope
what ever that other boat was -nope
what other boats did he part out and sell that I am missing..
what would make this one different????
I guess he still has time to get the Nortech ready for the Clear Lake Christmas parade....
Magnum- nope
Scary Mary-nope
Flatdeck Scarab-Nope
what ever that other boat was -nope
what other boats did he part out and sell that I am missing..
what would make this one different????
I guess he still has time to get the Nortech ready for the Clear Lake Christmas parade....
scarab flat deck - sold for a profit finishing not needed
Excalibur - finished and actualy for sale right now as a running boat
27 BAJA - finished and constantly shredding drives and couplers (must have ben some power there??
The Magnum is actually the only one that I didn't finish, but that is not totally true since YOU have actually ridden in that boat. Oh wait, most of you rode in Scary Mary, so that one counts twice.
Oh and don't forget the Cafe Racer from lear lake that was a hell of a battle, but that one eventually got finished as well.
Keep up the hating and I won't be picking you up for a shake down ride next Sunday...........
Waiting on oil coolers to get here. Ignitions will be here tomorrow. Picked up the second engine this morning from Owens. First engine is ready to stick after I finish building a wiring harness for it tomorrow. Second one I am waiting on some random part like fuels pump, and coupler and water pump etc.
Does anyone have an extra drive coupler?? I need one of those too....
The 6pm - 10PM building schedule is working out OK actually.
Registered
Platinum Member
Registered
Platinum Member
Oh and I finished the Taylor, and that jet boat.
Just because Smooth finished 1 poker run in 8 years on all 3 engines, doesn't mean you are above the rest of us on the project boat ladder.
Just because Smooth finished 1 poker run in 8 years on all 3 engines, doesn't mean you are above the rest of us on the project boat ladder.
Registered
Platinum Member
Platinum Member
Platinum Member
Join Date: May 2005
Location: Magnolia, Texas
Posts: 2,124
Likes: 0
Received 0 Likes
on
0 Posts