VR1 project
#1
VR1 project
These are the latest pics of this work in progress. This is the boat that came out of NC. Wrap was removed. Windshield installed. Interior removed. Rub rail removed. Ready to paint. I'll post more as it moves forward.
#8
Registered
Platinum Member
#9
Yes, work is being done at Velocity.
I'm near the factory and wanted to work with Kenny on a project. i've had a bunch of Fountains but this is the first Velocity.
Its getting ready for paint.
I'm near the factory and wanted to work with Kenny on a project. i've had a bunch of Fountains but this is the first Velocity.
Its getting ready for paint.
#10
Registered
Join Date: Jun 2006
Location: Seneca Lake
Posts: 253
Likes: 0
Received 0 Likes
on
0 Posts
Fools Gold
Kenny is good man, he just did some work on my 290sc with a 600 sci , put a whipple stage 2 kit in , went through lower unit. Got boat from 84 to 92mph . Its still down there if you want to look at it for interior ideas. Tell that knucklehead i said hi. Velocitys are a great boat you will enjoy it over a fountain .
Kenny is good man, he just did some work on my 290sc with a 600 sci , put a whipple stage 2 kit in , went through lower unit. Got boat from 84 to 92mph . Its still down there if you want to look at it for interior ideas. Tell that knucklehead i said hi. Velocitys are a great boat you will enjoy it over a fountain .
Last edited by wellcrafted; 01-17-2013 at 10:11 AM.